PT. Kharisma Jaya Prima
KP
Workshop & Warehouse Kariangau KM 13

PT. KHARISMA JAYA PRIMA

Pusat Penyediaan & Overhaul Suku Cadang Alat Berat Pertambangan Batubara Kaltim (Komatsu, Caterpillar, Hitachi, Kobelco).

Pendapatan Bulan Ini
Rp 1,09 M
Target Kuartal III: 92% Tercapai
SPK Workshop Aktif
4 Unit
2 Engine Overhaul, 1 Hyd, 1 UC
Total Nilai Stok
Rp 4,82 M
4 Hub Gudang Kaltim
Health Score AI
94 / 100
Kondisi Finansial Prima

Arus Pendapatan vs Beban Operasional 2026

Realisasi Penjualan Part Alat Berat & Jasa Overhaul Bengkel (Dalam Juta Rupiah)

Jan - Agu 2026

Komposisi Suku Cadang

Berdasarkan Nilai Valuasi Stok

Undercarriage (42%)
Engine Parts (26%)
Hydraulic (18%)
Filtration (14%)

Monitoring Workshop & Service

Lihat Semua SPK →
SPK-WRK/2026/08/0055 Dyno Test & Calibration
Komatsu Excavator PC400-8 (Unit EX-412)
Major Engine Overhaul (SAA6D140E-5) • PT. Pamapersada Nusantara (PAMA)
Lead Tech: Agus Setiawan (POP K3 Certified) 85% Selesai
SPK-WRK/2026/08/0052 Final QC & Pressure Test
Caterpillar Off-Highway Truck CAT 777D (Unit DT-708)
Rebuild Dual Hoist & Steering Cylinder • PT. Kaltim Prima Coal (KPC)
Lead Tech: Budi Hartono (Master Hydraulic) 95% Selesai
SPK-WRK/2026/08/0049 Completed / Unit Commissioned
Hitachi Excavator ZX470-5G (Unit EX-092)
Emergency Field Service: Main Pump Replacement • PT. Berau Coal
Lead Tech: Rian Pratama (Field Specialist) 100% Selesai
SPK-WRK/2026/08/0046 In Progress (Pin Pressing)
Komatsu Bulldozer D85ESS-2 (Unit DZ-105)
Undercarriage Pin & Bushing Turn & Track Alignment • PT. Bukit Makmur Mandiri Utama (BUMA)
Lead Tech: Surya Wijaya (Undercarriage Tech) 45% Selesai

Pengiriman & Penjualan Terkini

Lihat Semua PO →
SO-KJP/2026/08/0142 Rp 262.404.000
PT. Kaltim Prima Coal (KPC)
Track Link PC200-8 (4 SET), Piston Liner SAA6D140E (6 SET), Filter Donaldson (40 PCS)
Sangatta Coal Mine (Pit Bendili) TOP 30 Hari (Unpaid)
SO-KJP/2026/08/0139 Rp 380.508.000
PT. Pamapersada Nusantara (PAMA)
Track Group D8R/D9T Berco (2 SET), Seal Kit CAT 777D (6 SET)
Site Kideco Paser / Balikpapan Hub Paid Lunas
SO-KJP/2026/08/0135 Rp 182.928.000
PT. Berau Coal
Main Relief Valve ZX350 (4 PCS), Track Roller ZX470 (16 PCS)
Binungan Mine Operation TOP 45 Hari (Unpaid)
SO-KJP/2026/08/0128 Rp 141.192.000
PT. Bukit Makmur Mandiri Utama (BUMA)
Bucket Tooth Tiger Point PC400 (60 PCS), CAT Filter Pack (120 PCS)
Site Lati Berau Paid Lunas
SO-KJP/2026/08/0122 Rp 241.980.000
PT. Bayan Resources Tbk
Main Hydraulic Pump PC200 (2 ASSY), J350 Adapter CAT (40 PCS)
Tabang Coal Basin Kutai Kartanegara Paid Lunas

Jaringan Pergudangan & Logistik Kalimantan Timur

PT. Kharisma Jaya Prima - Hub Distribusi Suku Cadang Cepat Tanggap

W1 Aktif 24/7
Gudang Pusat Kariangau
KIK Balikpapan
Kapasitas: 1.400 m² 1420 SKU
W2 Aktif 24/7
Gudang Logistik Batakan
Balikpapan Timur
Kapasitas: 650 m² 580 SKU
W3 Aktif 24/7
Warehouse Site Sangatta
KPC Pit Support Area
Kapasitas: 450 m² 310 SKU
W4 Aktif 24/7
Warehouse Site Berau
Binungan / Lati Basin
Kapasitas: 400 m² 275 SKU
Home Stok Part SPK Servis Keuangan AI Advisor